You are about to leave the Exide Global site. The charger is NOT for outdoor use. Exide -GNB 2100 HP - high frequency charger Exide Battery Charger Product Support | ManualsOnline.com h)This charger is factory set to charge flooded lead-acid batteries only. It remains closed for approximately ten minutes. GNB shall not be obligated to reimburse the original user or any other person for any work performed. g)The charger is NOT for outdoor use. Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. WARNING: IMPROPER WIRE AND JUMPER CONNECTION MAY CAUSE SEVERE DAMAGE TO THE CHARGER AND BATTERY, 120 VAC CONFIGURATION (120/208/240V INPUT), 208 VAC CONFIGURATION (208/240/480V INPUT), 208 VAC CONFIGURATION (120/208/240V INPUT), 240 VAC CONFIGURATION (208/240/480V INPUT), 240 VAC CONFIGURATION (120/208/240V INPUT), 480 VAC CONFIGURATION (208/240/480V INPUT), 208VAC CONFIGURATION (208/240/480V INPUT), 240VAC CONFIGURATION (208/240/480V INPUT), 480VAC CONFIGURATION (208/240/480V INPUT), 208VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX- XX-XXXXT1Z ONLY), 240VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX -XX-XXXXT1Z ONLY), 480VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX -XX-XXXXT1Z ONLY). The DC output fuse is a "fast-acting" fuse used to protect the power semiconductors of a charger. Exide Battery Charger tn80dx080 1 Solutions there is no problem just want to go over setup 6a Exide Battery Charger 7001207 0 Solutions Is a wiring diagram available for Exide NPC 18-3-9 Exide Battery Charger NPC 18-3-950L 0 Solutions need manual for exide model ES3-12-850 charger Exide Battery Charger ES3-12-850 0 Solutions After electrical connection is completed, the charger is ready for operation. THE CHARGER PROPERLY USING THE THREADED M6 HOLE (GND) PROVIDED. 4.2 Battery with wrong number of cells connected to a charger. 2. If the voltage is not under voltage, please open the charger casing in case of power failure, and observe whether the fuse, transformer, circuit board and other components are obviously burnt or damaged. Keep the manual in a s afe and c onvenient, It is advisable to thoroughly read the information on battery safety. 2. Click here for more information. 7.2.1 JIC SWITCH ASSEMBLY. a)Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. It will then enter into force 20 days later and start applying after 42 months - allowing plenty of time for the industry to implement the changes and for standardisers to produce or update the necessary harmonised standards. Enter your email address and check your inbox. Proper fuse ratings can be found in Table 2 and Table 3(see pages 9-12) for AC input fuses (F1, F2 in case of a single phase input or F1, F2, F3 in case of a three phase input). 9.2 Momentary Remote and Stop Operation . Have the charger examined by a GNB service representative or local qualified service facility. SPP PowrPak Series Industrial Battery Chargers. When the battery voltage is lower than 20V, you can short the J2 and J3 connecting lines on the charger circuit board. Have the charger examined by a GNB service representative or local qualified service facility. During the initial three (3) years of charger warranty period, GNB will bear all parts and labor costs of such repair or replacement. h)This charger is factory set to charge lead-acid batteries only. The charger does not, exhibit high in-rush current, therefore type B or C circuit breakers, CAUTION - To reduce the risk of fire, use only on circuits provided, with branch circuit protection consistent with the current indicated, on the rating label and i n accordance with the National Electrical, The circuit breakers rating should be bas ed on the chargers. This change should be done by a qualified electrical contractor. INSTALLATION & OPERATING INSTRUCTIONS SCR FLX SERIES INDUSTRIAL BATTERY CHARGERS. This website is best viewed in Internet Explorer 10 or above. - C 410 186 47. STONE, BRICK, CONCRETE OR METAL. Indication Abbreviation Interpretation 1.00 2.00 3.00 4.00 5.00 6.00 8.00 1 hour delay set 2 hour delay set 3 hour delay set 4 hour delay set 5 hour delay set 6 hour delay set 8 hour delay set Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts CHP CHamPion Control board is set to 2.55VPC not 2. How to manage the battery in the forklift? GNB will only bear costs for freight 12 months from the initial date of shipment on any replacement or repair. What are the commonly used batteries for AGV cars? Final details will not be available until the legislation is published in the EU Official Journal in July. Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. Indication FdC and FAULT LED is on. Significant savings can be made on energy and operating costs and in CO 2 output. d)If the battery is unplugged during charging, the charger will indicate OFF/FCA. - 3.5 5 B 190 86.2 9 12 8 12 4 6 C.F. INSTALLATION & OPERATING INSTRUCTIONS SCR FLX SERIES INDUSTRIAL BATTERY CHARGERS. The equipment has been f actory set and does, This product has been designed, manufactured and certified to be, in conformance with UL Standards. Primary switch contacts, fuses, bulbs, and filters are not warranted unless found to be defective prior to use. If the battery is unplugged during charging, the charger will indicate OFF. 1.3The charger receives proper care, protection, and maintenance under supervision of competent personnel. All SCR100 battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. 8.0 CABINET OUTLINE/DIMENSIONS FOR Z MODEL CHARGERS ONLY CABINET A B C D D (Mining) E (Mining) DIM. | Products Similarly when changing input voltage between 1) 208, 240, 480 VAC or 2) 380, 415VAC (three phase input) follow the schematics on Figure 2 or Figure 3 (pages 5-6) whichever is applicable. Take it to a qualified GNB service center. When stacking chargers on top of each other, ensure that cabinets are bolted together using properly sized black #1/4-20 UNC hardware provided in all four corners on top cover. The charger is warranted for four (4) years from the date of manufacture as determined by the product serial number, with the following exceptions: 3.1Power transformers, SCR's and silicon diodes are warranted for ten (10) years from the date of manufacture of the charger(s) of which they are a part. 22 May 2020 14:53. PDF Sales - Service - Recycling Scr200 Series Industrial Battery Chargers 1 European Parliament last week passed the new EU Machinery Regulation. The input. Verify connection of primary windings of power transformer and AC fuses of charger per connected AC voltage and electricians tag. During year four (4) of the warranty, GNB will only cover parts, no labor or travel will be provided by GNB. Repair or clean battery lugs. d)If the battery is unplugged during charging, the charger will indicate OFF. Check the contents of the package against the delivery slip before disposing of the shipping package. Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. They are designed to charge flooded lead-acid batteries only. 1. A JIC type charger can only be factory installed and is available in a B, C or D size cabinet. f)De-energize all AC and DC power connections before servicing this unit. FOR SUPPLY CONNECTIONS, GROUND CHARGER PROPERLY USING GROUNDING STUD (GND) PROVIDED. For battery sizes not listed, contact your local GNB service representative. 8.0 CABINET OUTLINE/DIMENSIONS 13. High Visibility - Charge Status Indicator, Soft-keys (The function of the button will be displayed on the LCD Display), *Watering system (Shown when enabled, flashing during operation), Equalise (Shown when enabled, flashing during operation), Automatic Equalise (Shown when enabled, flashing during operation), Battery Recovery Mode (Shown when enabled, flashing during operation), *Air system enabled (Shown when enabled, flashing during operation), Before connecting the battery, check that the battery voltage, corresponds to the voltage indicated inside the battery, symbol on the LCD Display. What is the voltage of the forklift battery? IMPORTANT OPERATING AND SAFETY INSTRUCTIONS, 9.1 SCR100 Charger Functional Description, APPENDIX A: SCR100 BATTERY CHARGERS LIST OF DISPLAY INDICATIONS, APPENDIX B: ELECTRICAL SCHEMATIC DRAWINGS, SCR100 SERIES INDUSTRIAL BATTERY CHARGERS, 1.0 IMPORTANT OPERATING AND SAFETY INSTRUCTIONS. (Section 9.1. NOTE: The following applies to three phase chargers only: if the charger indicates FAC or F3 upon start-up, it means that there is a low or high AC voltage (+35%) or AC phase missing. The Exide 12/5.5 charger (12 V, 5.5 A) is perfect for basic needs. Fuses with an ampere rating of 30A or less are smaller and need fuse reducers when placed in a 60A fuseblock. The charger comes with a ground lug attached to the stud, clearly marked on the chassis. A charge can be stopped by pressing STOP and resumed by pressing STOP again. - C.F. When stacking chargers on top of each other, ensure that cabinets are bolted together using properly sized black #1/4-20 UNC hardware provided in all four corners on top cover. Exide Technologies SCRFLX Charger : Owner's manual - ManualShelf Power transformers, SCR's and silicon diodes are warranted for ten (10) years from the date of manufacture of the charger(s) of which they are a part. NOTE: Use only identical replacement fuses obtainable from your GNB service representative. Operating Instructions and Safety Precautions for the 2100LP & 2100HP Chargers Safety Careful consideration must be taken when connecting this charger to a generator. Exide Technologies SCRFLX User Manual Large easy to read LEDs, three button keypad and LED display report on charger and battery status. Do not disassemble the charger. 2100 HP. The Remote Stop / Equalize option is available for Z model chargers B and C cabinets, 6 36 cells only. Final details will not be available until the legislation is published in the EU Official Journal in July. For an equalize charge cycle, the current value is displayed as [ xx.xx E). The generator should have, load step immunity to prevent undershoot and overshoot with, typical loads. A 15.10 22.70 32.10 24.30 24.30 24.30 DIM. 3. APPENDIX A: SCRFLX BATTERY CHARGERS. - To restart the charger, plug in the next battery. a)Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. United States, Bluestar Global Logistics, John Brodie, 65, suffered DRIVERLESS/AUTOMATED MATERIALS HANDLING - April 2023. Have the charger examined by a GNB service representative or local qualified service facility. Once finished, refer to Table 2 (pages 9-10) for the correct size of AC input fuses. D3E2-24-850B Exide Depth Charger showing codes C=04 & E=05 with connected battery and disconnected too.. b)Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. ri0hG7?kuy&3kao=`#oJ^._0SSFO=hv0"4?GOGDRHD&?pI.\g\&JCn`@4[8w+3LL.2|?fi ?Of^jhRYhg`iz"{vpLL2_F8_RcY];u(itj{. Except as authorized in writing, this warranty does not cover any equipment that has been repaired or modified by any party other than GNB. Unplug the J2 and J3 pins on the board (the board is completely out of the circuit), using a foil or A small length of metal wire connects the two plugs J2 and J3 directly. PACIFIC CHLORIDE GNB Industrial Power Motive Power GNB Industrial Power Motive Power Exide Technologies Chloride Motive Power 829 Parkview Boulevard Lombard, IL 60148-3249 U.S.A. Tel: 877.GNB.INFO Fax: 630.691.7869 8301 Keele Street Maple, Ontario Canada L6A 1T2 Tel: 905.669.9326 Fax: 905.669.7688 P.O. Copyright 2021Exide Technologies. For proper connection, torque the screws to approximately 25 inch-pounds. Industrial battery chargers dec200 series (20 pages), Scr series chargers with single phase input (68 pages), Scr 100 series industrial battery charger (39 pages), Dedicated fast charger for industrial batteries (19 pages), Manual will be automatically added to "My Manuals", Battery Charger GNB Industrial Battery Charger Installation And Operation Manual, Battery Charger GNB SCR SERIES Installation & Operating Instructions Manual, Battery Charger GNB SCR100-06-260S1Z Installation & Operating Instructions Manual, Battery Charger GNB EHF Series Operating Instructions And Safety Manual, Battery Charger GNB FURY X-3 Installation And Operating Instruction Manual, Battery Charger GNB Tubular LMX Installation And Operating Instructions. Consult GNB technician. If injury does occur, apply the prescribed treatment for electrical shock and obtain medical attention immediately. The charger has a comprehensive self-checking diagnostic program to control all charger functions, monitor the quality of charge and check its own safety conditions. Is the stream module damaged? The DC charging cable has a commonly used battery plug or receptacle. they are displayed when no battery is connected. 1.4The charger is used within the published performance rating for the unit involved. e)Only qualified personnel should operate or service this equipment. supplied with the battery, prior to charging. Do not touch un-insulated. CHARGING LED DOES NOT LIGHT ON AFTER BATTERY CONNECTION Possible Cause Action 4.1 Connection between charger and battery open. CAUTION: DO NOT EQUALIZE MORE OFTEN THAN REQUIRED BY THE CONDITION OF THE BATTERY, AS SPECIFIED IN THE BATTERY MAINTENANCE INSTRUCTIONS. Andreas Geamanu Global Sales & Marketing, Lopos Whatever your objective, we Australian logistics tech firm leverages the UK FTA, Shifting 100 T of food a day is no mean feat for Foodbank Queensland, Cold robots revolutionise cold chain logistics.
Add Vmware Workstation Console Tools Into System Path,
Carriage Hill Apartments Canfield Ohio,
Fontana Noise Ordinance Times,
What Are All Inclusive Raiders Tickets?,
Articles E